The summary of the selected article appears at the bottom of the page. In order to get back to the contents of the issue this article belongs to you have to access the link from the title. In order to see all the articles of the archive which have as author/co-author one of the authors mentioned below, you have to access the link from the author's name.

 
       
         
    STUDIA ENGINEERING - Issue no. 1 / 2021  
         
  Article:   THE DESIGN AND EXECUTION OF A LABORATORY MICRO HYDROELECTRIC POWER PLANT.

Authors:  ELISABETA SPUNEI, IONEL TURCU, ALINA VIȘAN.
 
       
         
  Abstract:  
DOI: 10.24193/subbeng.2021.1.5

Published Online: 2021-11-09
pp. 45-56

VIEW PDF

FULL PDF: VOL.66, No.1, 2021

Abstract: The paper presents a laboratory micro hydroelectric power plant destined to applicative activities. The hydraulic turbine is a Pelton turbine, rebuilt by fast prototyping in Geomagic Design X and printed on a 3 D printer. The turbine casing and the afferent elements are made in-house. The hydrogenator is synchronous being an alternator from a Dacia vehicle. The hydrogenerator load is constituted by 3 groups of light bulbs. We analysed the working of the micro-hydroelectric power plant in idle run and for different loads. As a result of the analysis we found out that it stably works for different loads and by its open construction it is useful for developing students’ ability to understand the phenomena. The installation designed and executed is useful for the engineering students as the pandemic forbids the thematical visits in hydro-energetic facilities.

Keywords: micro hydroelectric power plant, renewable energy, Pelton turbine, 3D printer.
 
         
     
         
         